zondag 14 december 2014

zaterdag 6 september 2014

11-15 ZINE Out Now

11-15 ZINE vol.1 and vol. 2 with reclaimed cardboard stencil cover are on sale now, only 2euro/zine.
All proceeds go to concrete and building supplies for current and future skate spots.
Give back to skateboarding and get one of the 50 zines made.

maandag 14 juli 2014

Knock Out Griptape

For everybody who rides big boards we now have 11 inch griptape !





get them while you can !

zaterdag 5 juli 2014

Knock Out Socks

Support our cause and your feet at the same time with the new KNOCK OUT SOCKS !


Ask someone of the cruë to get your own pair or order online at our new webshop !

woensdag 11 juni 2014

Kwinten' s shed

Before



After 
 to be skated soon !

vrijdag 2 mei 2014

Blocks in Nieuwpoort


Go grind some crete!

maandag 21 april 2014

Basement lurking




Printing some stickers with Mr.White


zondag 13 april 2014

Special order !

 Special shape parking blocks for the new skatepark in Nieuwpoort 

maandag 24 maart 2014

Confusion #8



Confusion #8 is out!! Including a double page foto review from the Rampjam made by the Wimme/ Bluestone diy project from our OZ friends and loads more gnarly shit! Order it on http://confusionmagazine.bigcartel.com/ or by it in Belgium at: #13 skateshop/Twits/Lockwood/Ride All Day or Brabo's Hand Tat Shop!!
Support the underground or save your money for new Nike's!!

Concrete Dreams


Some of us are working with Concrete Dreams as well.
Their next project includes 18 meters of our round ones
and possibly some parking blocks!!!
Check their facebook to stay tuned.
https://www.facebook.com/concretedreamsskateparks?ref=stream

Cruise & Booze










Our extension got killed pretty hard in Eindhoven a couple weeks ago, here's a couple pics and a video.
Fuck steel, grind crete!

zondag 23 februari 2014

Billy's DIY

One day I got a call from Robby who has the numero 13 skateshop.
He told me they were planning to built a little bowl in one of his shop riders  backyard and if we were interested to be a part of the construction and to provide them with pool coping .
Without thinking we said yes (ofcourse) and I went to look at the project later that week.
As it turns out they where going to build  inside a little shed and it already looked very promising.
The concrete was ordered for next saturday and volunteers where asked to help.
D day arrived  and so did the concrete which all got dumped in Billy's living room and then with the help off buckets got poured in place and hand stacked.
Benne ,Mikjel and Bruno  who work in the skateparkbuilding industry (concrete-dreams   and concreteflow) are some off the capable hands to master the concrete and made this bowl what it is today.

Later that week me and kwinten returned to install the pool coping.
The rest is history, hopefully this little gem stays around for a while and sees many sessions !